Home › Bengaluru › Banashankari → RV Road
Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.
Banashankari to RV Road metro: route, fare and timings
₹10, about 2 minutes, 1 stations, no change of line.
Banashankari → RV Road
- Travel time
- 2 min
- Stations
- 1
- Changes
- Direct
- Token / QR ticket₹10
- Smart card, peak hours₹9.50
- Smart card, off-peak₹9
Your route
- BanashankariBoard the Green Line at Banashankari, towards Madavara. Ride 1 station (2 min).
- RV RoadArrive at RV Road
All 2 stations on the way
- Banashankari
- RV Road
Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday | 4:29 am → 4:32 am | 11:19 pm → 11:22 pm |
| Tuesday to Saturday | 5:14 am → 5:17 am | 11:19 pm → 11:22 pm |
| Sunday | 7:14 am → 7:17 am | 11:10 pm → 11:13 pm |
| Holidays | 5:14 am → 5:17 am | 11:19 pm → 11:22 pm |
Leave Banashankari → arrive RV Road. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.
Questions
- What is the metro fare from Banashankari to RV Road?
- ₹10 by token or QR ticket. Smart card, peak hours: ₹9.50; Smart card, off-peak: ₹9.
- How long does the metro take from Banashankari to RV Road?
- About 2 minutes for 1 stations (1.4 km), no change of line.
- When is the first and last metro from Banashankari to RV Road?
- On Monday: first at 4:29 am, last that still reaches RV Road at 11:19 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations83 stations, A to Z
- Green LineSilk Institute – Madavara
- Yellow LineRV Road – Bommasandra
- Purple LineWhitefield – Challaghatta
Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.