Home › Bengaluru › Chickpete → Madavara
Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.
Chickpete to Madavara metro: route, fare and timings
₹70, about 32 minutes, 17 stations, no change of line.
Chickpete → Madavara
- Travel time
- 32 min
- Stations
- 17
- Changes
- Direct
- Token / QR ticket₹70
- Smart card, peak hours₹66.50
- Smart card, off-peak₹63
Your route
- ChickpeteBoard the Green Line at Chickpete, towards Madavara. Ride 17 stations (32 min).
- MadavaraArrive at Madavara
All 18 stations on the way
- Chickpete
- Majestic
- Sampige Road
- Srirampura
- Kuvempu Road
- Rajajinagar
- Mahalakshmi
- Sandal Soap Factory
- Yeshwantpur
- Goraguntepalya
- Peenya
- Peenya Industry
- Jalahalli
- Dasarahalli
- Nagasandra
- Manjunathanagara
- Chikkabidarakallu
- Madavara
Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday | 4:43 am → 5:15 am | 11:33 pm → 12:05 am |
| Tuesday to Saturday | 5:28 am → 6:00 am | 11:33 pm → 12:05 am |
| Sunday | 7:28 am → 8:00 am | 11:24 pm → 11:56 pm |
| Holidays | 5:28 am → 6:00 am | 11:33 pm → 12:05 am |
Leave Chickpete → arrive Madavara. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.
Questions
- What is the metro fare from Chickpete to Madavara?
- ₹70 by token or QR ticket. Smart card, peak hours: ₹66.50; Smart card, off-peak: ₹63.
- How long does the metro take from Chickpete to Madavara?
- About 32 minutes for 17 stations (17.8 km), no change of line.
- When is the first and last metro from Chickpete to Madavara?
- On Monday: first at 4:43 am, last that still reaches Madavara at 11:33 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations83 stations, A to Z
- Green LineSilk Institute – Madavara
- Yellow LineRV Road – Bommasandra
- Purple LineWhitefield – Challaghatta
Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.