Home › Bengaluru › Huskur Road → BTM Layout
Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.
Huskur Road to BTM Layout metro: route, fare and timings
₹50, about 22 minutes, 10 stations, no change of line.
Huskur Road → BTM Layout
- Travel time
- 22 min
- Stations
- 10
- Changes
- Direct
- Token / QR ticket₹50
- Smart card, peak hours₹47.50
- Smart card, off-peak₹45
Your route
- Huskur RoadBoard the Yellow Line at Huskur Road, towards RV Road. Ride 10 stations (22 min).
- BTM LayoutArrive at BTM Layout
All 11 stations on the way
- Huskur Road
- Konappana Agrahara
- Electronic City
- Beratena Agrahara
- Hosa Road
- Singasandra
- Kudlu Gate
- Hongasandra
- Bommanahalli
- Central Silk Board
- BTM Layout
Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday | 5:10 am → 5:32 am | 10:47 pm → 11:09 pm |
| Tuesday to Saturday | 6:05 am → 6:27 am | 10:47 pm → 11:09 pm |
| Sunday | 7:05 am → 7:27 am | 10:47 pm → 11:09 pm |
| Holidays | 6:05 am → 6:27 am | 10:47 pm → 11:09 pm |
Leave Huskur Road → arrive BTM Layout. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.
Questions
- What is the metro fare from Huskur Road to BTM Layout?
- ₹50 by token or QR ticket. Smart card, peak hours: ₹47.50; Smart card, off-peak: ₹45.
- How long does the metro take from Huskur Road to BTM Layout?
- About 22 minutes for 10 stations (12.1 km), no change of line.
- When is the first and last metro from Huskur Road to BTM Layout?
- On Monday: first at 5:10 am, last that still reaches BTM Layout at 10:47 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations83 stations, A to Z
- Green LineSilk Institute – Madavara
- Yellow LineRV Road – Bommasandra
- Purple LineWhitefield – Challaghatta
Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.