MetroRouteMetroRoute
हिं

Home › Bengaluru › Kudlu Gate → Lalbagh

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Kudlu Gate to Lalbagh metro: route, fare and timings

₹50, about 24 minutes, 10 stations, change at RV Road.

Kudlu Gate → Lalbagh

Fare · Token₹50
Travel time
24 min
Stations
10
Changes
1
  • Token / QR ticket₹50
  • Smart card, peak hours₹47.50
  • Smart card, off-peak₹45

Your route

  1. Kudlu GateBoard the Yellow Line at Kudlu Gate, towards RV Road. Ride 7 stations (15 min).
  2. RV RoadChange at RV Road to the Green Line, towards Madavara. Ride 3 stations (5 min).allow about 4 min to change platforms
  3. LalbaghArrive at Lalbagh
All 11 stations on the way
  1. Kudlu Gate
  2. Hongasandra
  3. Bommanahalli
  4. Central Silk Board
  5. BTM Layout
  6. Jayadeva Hospital
  7. Ragigudda
  8. RV Road
  9. Jayanagar
  10. South End Circle
  11. Lalbagh

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday5:23 am → 5:52 am11:00 pm → 11:27 pm
Tuesday to Saturday6:18 am → 6:52 am11:00 pm → 11:27 pm
Sunday7:18 am → 7:52 am10:50 pm → 11:18 pm
Holidays6:18 am → 6:52 am11:00 pm → 11:27 pm

Leave Kudlu Gate → arrive Lalbagh. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Kudlu Gate to Lalbagh?
₹50 by token or QR ticket. Smart card, peak hours: ₹47.50; Smart card, off-peak: ₹45.
How long does the metro take from Kudlu Gate to Lalbagh?
About 24 minutes for 10 stations (11.3 km), change at RV Road.
When is the first and last metro from Kudlu Gate to Lalbagh?
On Monday: first at 5:23 am, last that still reaches Lalbagh at 11:00 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.