MetroRouteMetroRoute
हिं

Home › Bengaluru › Kudlu Gate → Peenya Industry

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Kudlu Gate to Peenya Industry metro: route, fare and timings

₹80, about 51 minutes, 24 stations, change at RV Road.

Kudlu Gate → Peenya Industry

Fare · Token₹80
Travel time
51 min
Stations
24
Changes
1
  • Token / QR ticket₹80
  • Smart card, peak hours₹76
  • Smart card, off-peak₹72

Your route

  1. Kudlu GateBoard the Yellow Line at Kudlu Gate, towards RV Road. Ride 7 stations (15 min).
  2. RV RoadChange at RV Road to the Green Line, towards Madavara. Ride 17 stations (31 min).allow about 4 min to change platforms
  3. Peenya IndustryArrive at Peenya Industry
All 25 stations on the way
  1. Kudlu Gate
  2. Hongasandra
  3. Bommanahalli
  4. Central Silk Board
  5. BTM Layout
  6. Jayadeva Hospital
  7. Ragigudda
  8. RV Road
  9. Jayanagar
  10. South End Circle
  11. Lalbagh
  12. National College
  13. KR Market
  14. Chickpete
  15. Majestic
  16. Sampige Road
  17. Srirampura
  18. Kuvempu Road
  19. Rajajinagar
  20. Mahalakshmi
  21. Sandal Soap Factory
  22. Yeshwantpur
  23. Goraguntepalya
  24. Peenya
  25. Peenya Industry

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday5:23 am → 6:18 am11:00 pm → 11:53 pm
Tuesday to Saturday6:18 am → 7:18 am11:00 pm → 11:53 pm
Sunday7:18 am → 8:18 am10:50 pm → 11:44 pm
Holidays6:18 am → 7:18 am11:00 pm → 11:53 pm

Leave Kudlu Gate → arrive Peenya Industry. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Kudlu Gate to Peenya Industry?
₹80 by token or QR ticket. Smart card, peak hours: ₹76; Smart card, off-peak: ₹72.
How long does the metro take from Kudlu Gate to Peenya Industry?
About 51 minutes for 24 stations (25.7 km), change at RV Road.
When is the first and last metro from Kudlu Gate to Peenya Industry?
On Monday: first at 5:23 am, last that still reaches Peenya Industry at 11:00 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.