MetroRouteMetroRoute
हिं

Home › Bengaluru › Lalbagh → Beratena Agrahara

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Lalbagh to Beratena Agrahara metro: route, fare and timings

₹60, about 31 minutes, 13 stations, change at RV Road.

Lalbagh → Beratena Agrahara

Fare · Token₹60
Travel time
31 min
Stations
13
Changes
1
  • Token / QR ticket₹60
  • Smart card, peak hours₹57
  • Smart card, off-peak₹54

Your route

  1. LalbaghBoard the Green Line at Lalbagh, towards Silk Institute. Ride 3 stations (5 min).
  2. RV RoadChange at RV Road to the Yellow Line, towards Bommasandra. Ride 10 stations (22 min).allow about 4 min to change platforms
  3. Beratena AgraharaArrive at Beratena Agrahara
All 14 stations on the way
  1. Lalbagh
  2. South End Circle
  3. Jayanagar
  4. RV Road
  5. Ragigudda
  6. Jayadeva Hospital
  7. BTM Layout
  8. Central Silk Board
  9. Bommanahalli
  10. Hongasandra
  11. Kudlu Gate
  12. Singasandra
  13. Hosa Road
  14. Beratena Agrahara

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday4:53 am → 5:27 am11:33 pm → 12:17 am
Tuesday to Saturday5:38 am → 6:22 am11:33 pm → 12:17 am
Sunday7:38 am → 8:16 am11:37 pm → 12:17 am
Holidays5:38 am → 6:22 am11:27 pm → 12:17 am

Leave Lalbagh → arrive Beratena Agrahara. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Lalbagh to Beratena Agrahara?
₹60 by token or QR ticket. Smart card, peak hours: ₹57; Smart card, off-peak: ₹54.
How long does the metro take from Lalbagh to Beratena Agrahara?
About 31 minutes for 13 stations (14.8 km), change at RV Road.
When is the first and last metro from Lalbagh to Beratena Agrahara?
On Monday: first at 4:53 am, last that still reaches Beratena Agrahara at 11:33 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.