MetroRouteMetroRoute
हिं

Home › Bengaluru › Lalbagh → Bommasandra

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Lalbagh to Bommasandra metro: route, fare and timings

₹70, about 42 minutes, 18 stations, change at RV Road.

Lalbagh → Bommasandra

Fare · Token₹70
Travel time
42 min
Stations
18
Changes
1
  • Token / QR ticket₹70
  • Smart card, peak hours₹66.50
  • Smart card, off-peak₹63

Your route

  1. LalbaghBoard the Green Line at Lalbagh, towards Silk Institute. Ride 3 stations (5 min).
  2. RV RoadChange at RV Road to the Yellow Line, towards Bommasandra. Ride 15 stations (33 min).allow about 4 min to change platforms
  3. BommasandraArrive at Bommasandra
All 19 stations on the way
  1. Lalbagh
  2. South End Circle
  3. Jayanagar
  4. RV Road
  5. Ragigudda
  6. Jayadeva Hospital
  7. BTM Layout
  8. Central Silk Board
  9. Bommanahalli
  10. Hongasandra
  11. Kudlu Gate
  12. Singasandra
  13. Hosa Road
  14. Beratena Agrahara
  15. Electronic City
  16. Konappana Agrahara
  17. Huskur Road
  18. Hebbagodi
  19. Bommasandra

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday4:53 am → 5:38 am11:33 pm → 12:28 am
Tuesday to Saturday5:38 am → 6:33 am11:33 pm → 12:28 am
Sunday7:38 am → 8:27 am11:37 pm → 12:28 am
Holidays5:38 am → 6:33 am11:27 pm → 12:28 am

Leave Lalbagh → arrive Bommasandra. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Lalbagh to Bommasandra?
₹70 by token or QR ticket. Smart card, peak hours: ₹66.50; Smart card, off-peak: ₹63.
How long does the metro take from Lalbagh to Bommasandra?
About 42 minutes for 18 stations (20.8 km), change at RV Road.
When is the first and last metro from Lalbagh to Bommasandra?
On Monday: first at 4:53 am, last that still reaches Bommasandra at 11:33 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.