MetroRouteMetroRoute
हिं

Home › Bengaluru › Magadi Road → Mysuru Road

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Magadi Road to Mysuru Road metro: route, fare and timings

₹30, about 10 minutes, 5 stations, no change of line.

Magadi Road → Mysuru Road

Fare · Token₹30
Travel time
10 min
Stations
5
Changes
Direct
  • Token / QR ticket₹30
  • Smart card, peak hours₹28.50
  • Smart card, off-peak₹27

Your route

  1. Magadi RoadBoard the Purple Line at Magadi Road, towards Challaghatta. Ride 5 stations (10 min).
  2. Mysuru RoadArrive at Mysuru Road
All 6 stations on the way
  1. Magadi Road
  2. Hosahalli
  3. Vijayanagar
  4. Attiguppe
  5. Deepanjali Nagar
  6. Mysuru Road

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday5:07 am → 5:17 am11:23 pm → 11:33 pm
Tuesday to Saturday5:52 am → 6:02 am11:23 pm → 11:33 pm
Sunday7:52 am → 8:02 am11:37 pm → 11:47 pm
Holidays5:52 am → 6:02 am11:23 pm → 11:33 pm

Leave Magadi Road → arrive Mysuru Road. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Magadi Road to Mysuru Road?
₹30 by token or QR ticket. Smart card, peak hours: ₹28.50; Smart card, off-peak: ₹27.
How long does the metro take from Magadi Road to Mysuru Road?
About 10 minutes for 5 stations (5.6 km), no change of line.
When is the first and last metro from Magadi Road to Mysuru Road?
On Monday: first at 5:07 am, last that still reaches Mysuru Road at 11:23 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.