MetroRouteMetroRoute
हिं

Home › Bengaluru › Pattanagere → Kengeri

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Pattanagere to Kengeri metro: route, fare and timings

₹10, about 5 minutes, 2 stations, no change of line.

Pattanagere → Kengeri

Fare · Token₹10
Travel time
5 min
Stations
2
Changes
Direct
  • Token / QR ticket₹10
  • Smart card, peak hours₹9.50
  • Smart card, off-peak₹9

Your route

  1. PattanagereBoard the Purple Line at Pattanagere, towards Challaghatta. Ride 2 stations (5 min).
  2. KengeriArrive at Kengeri
All 3 stations on the way
  1. Pattanagere
  2. Kengeri Bus Terminal
  3. Kengeri

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday5:27 am → 5:32 am11:43 pm → 11:48 pm
Tuesday to Saturday6:12 am → 6:17 am11:43 pm → 11:48 pm
Sunday8:12 am → 8:17 am11:57 pm → 12:02 am
Holidays6:12 am → 6:17 am11:43 pm → 11:48 pm

Leave Pattanagere → arrive Kengeri. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Pattanagere to Kengeri?
₹10 by token or QR ticket. Smart card, peak hours: ₹9.50; Smart card, off-peak: ₹9.
How long does the metro take from Pattanagere to Kengeri?
About 5 minutes for 2 stations (3.1 km), no change of line.
When is the first and last metro from Pattanagere to Kengeri?
On Monday: first at 5:27 am, last that still reaches Kengeri at 11:43 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.