Home › Bengaluru › Pattandur Agrahara → Hopefarm Channasandra
Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.
Pattandur Agrahara to Hopefarm Channasandra metro: route, fare and timings
₹10, about 3 minutes, 2 stations, no change of line.
Pattandur Agrahara → Hopefarm Channasandra
- Travel time
- 3 min
- Stations
- 2
- Changes
- Direct
- Token / QR ticket₹10
- Smart card, peak hours₹9.50
- Smart card, off-peak₹9
Your route
- Pattandur AgraharaBoard the Purple Line at Pattandur Agrahara, towards Whitefield. Ride 2 stations (3 min).
- Hopefarm ChannasandraArrive at Hopefarm Channasandra
All 3 stations on the way
- Pattandur Agrahara
- Kadugodi Tree Park
- Hopefarm Channasandra
Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday | 5:30 am → 5:33 am | 12:20 am → 12:23 am |
| Tuesday to Saturday | 6:15 am → 6:18 am | 12:17 am → 12:20 am |
| Sunday | 8:15 am → 8:18 am | 12:13 am → 12:16 am |
| Holidays | 6:15 am → 6:18 am | 12:20 am → 12:23 am |
Leave Pattandur Agrahara → arrive Hopefarm Channasandra. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.
Questions
- What is the metro fare from Pattandur Agrahara to Hopefarm Channasandra?
- ₹10 by token or QR ticket. Smart card, peak hours: ₹9.50; Smart card, off-peak: ₹9.
- How long does the metro take from Pattandur Agrahara to Hopefarm Channasandra?
- About 3 minutes for 2 stations (2 km), no change of line.
- When is the first and last metro from Pattandur Agrahara to Hopefarm Channasandra?
- On Monday: first at 5:30 am, last that still reaches Hopefarm Channasandra at 12:20 am.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations83 stations, A to Z
- Green LineSilk Institute – Madavara
- Yellow LineRV Road – Bommasandra
- Purple LineWhitefield – Challaghatta
Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.