MetroRouteMetroRoute
हिं

Home › Bengaluru › Peenya Industry → JP Nagar

Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.

Peenya Industry to JP Nagar metro: route, fare and timings

₹70, about 36 minutes, 19 stations, no change of line.

Peenya Industry → JP Nagar

Fare · Token₹70
Travel time
36 min
Stations
19
Changes
Direct
  • Token / QR ticket₹70
  • Smart card, peak hours₹66.50
  • Smart card, off-peak₹63

Your route

  1. Peenya IndustryBoard the Green Line at Peenya Industry, towards Silk Institute. Ride 19 stations (36 min).
  2. JP NagarArrive at JP Nagar
All 20 stations on the way
  1. Peenya Industry
  2. Peenya
  3. Goraguntepalya
  4. Yeshwantpur
  5. Sandal Soap Factory
  6. Mahalakshmi
  7. Rajajinagar
  8. Kuvempu Road
  9. Srirampura
  10. Sampige Road
  11. Majestic
  12. Chickpete
  13. KR Market
  14. National College
  15. Lalbagh
  16. South End Circle
  17. Jayanagar
  18. RV Road
  19. Banashankari
  20. JP Nagar

Share on WhatsApp

Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday4:27 am → 5:02 am11:07 pm → 11:42 pm
Tuesday to Saturday5:12 am → 5:47 am11:07 pm → 11:42 pm
Sunday7:12 am → 7:47 am11:11 pm → 11:46 pm
Holidays5:12 am → 5:47 am11:01 pm → 11:36 pm

Leave Peenya Industry → arrive JP Nagar. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.

Questions

What is the metro fare from Peenya Industry to JP Nagar?
₹70 by token or QR ticket. Smart card, peak hours: ₹66.50; Smart card, off-peak: ₹63.
How long does the metro take from Peenya Industry to JP Nagar?
About 36 minutes for 19 stations (19.5 km), no change of line.
When is the first and last metro from Peenya Industry to JP Nagar?
On Monday: first at 4:27 am, last that still reaches JP Nagar at 11:07 pm.

You might also need

Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.