Home › Bengaluru › Swami Vivekananda Road → KSR Railway Station
Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.
Swami Vivekananda Road to KSR Railway Station metro: route, fare and timings
₹50, about 20 minutes, 9 stations, no change of line.
Swami Vivekananda Road → KSR Railway Station
- Travel time
- 20 min
- Stations
- 9
- Changes
- Direct
- Token / QR ticket₹50
- Smart card, peak hours₹47.50
- Smart card, off-peak₹45
Your route
- Swami Vivekananda RoadBoard the Purple Line at Swami Vivekananda Road, towards Challaghatta. Ride 9 stations (20 min).
- KSR Railway StationArrive at KSR Railway Station
All 10 stations on the way
- Swami Vivekananda Road
- Indiranagar
- Halasuru
- Trinity
- MG Road
- Cubbon Park
- Vidhana Soudha
- Central College
- Majestic
- KSR Railway Station
Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday | 4:45 am → 5:05 am | 11:01 pm → 11:21 pm |
| Tuesday to Saturday | 5:30 am → 5:50 am | 11:01 pm → 11:21 pm |
| Sunday | 7:30 am → 7:50 am | 11:15 pm → 11:35 pm |
| Holidays | 5:30 am → 5:50 am | 11:01 pm → 11:21 pm |
Leave Swami Vivekananda Road → arrive KSR Railway Station. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.
Questions
- What is the metro fare from Swami Vivekananda Road to KSR Railway Station?
- ₹50 by token or QR ticket. Smart card, peak hours: ₹47.50; Smart card, off-peak: ₹45.
- How long does the metro take from Swami Vivekananda Road to KSR Railway Station?
- About 20 minutes for 9 stations (10.2 km), no change of line.
- When is the first and last metro from Swami Vivekananda Road to KSR Railway Station?
- On Monday: first at 4:45 am, last that still reaches KSR Railway Station at 11:01 pm.
- KSR Railway Station → Swami Vivekananda Road
- Swami Vivekananda Road station
- KSR Railway Station station
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations83 stations, A to Z
- Green LineSilk Institute – Madavara
- Yellow LineRV Road – Bommasandra
- Purple LineWhitefield – Challaghatta
Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.