Home › Bengaluru › Swami Vivekananda Road → Nallurahalli
Unofficial site. Not run by or linked to BMRCL, HMRL, DMRC or any metro operator. Check fares and times at the station.
Swami Vivekananda Road to Nallurahalli metro: route, fare and timings
₹50, about 20 minutes, 9 stations, no change of line.
Swami Vivekananda Road → Nallurahalli
- Travel time
- 20 min
- Stations
- 9
- Changes
- Direct
- Token / QR ticket₹50
- Smart card, peak hours₹47.50
- Smart card, off-peak₹45
Your route
- Swami Vivekananda RoadBoard the Purple Line at Swami Vivekananda Road, towards Whitefield. Ride 9 stations (20 min).
- NallurahalliArrive at Nallurahalli
All 10 stations on the way
- Swami Vivekananda Road
- Baiyappanahalli
- Benniganahalli
- KR Puram
- Singayyanapalya
- Garudacharpalya
- Hoodi
- Seetharampalya
- Kundalahalli
- Nallurahalli
Fares go by how many stations you travel: ₹10 to ₹90. A smart card takes 5% off in peak hours (8 am to 12 noon and 4 to 9 pm, Monday to Saturday) and 10% off at other times, including all day Sunday and on 26 January, 15 August and 2 October. QR tickets cost the same as a token. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday | 5:06 am → 5:25 am | 11:56 pm → 12:15 am |
| Tuesday to Saturday | 5:51 am → 6:10 am | 11:53 pm → 12:12 am |
| Sunday | 7:51 am → 8:10 am | 11:49 pm → 12:08 am |
| Holidays | 5:51 am → 6:10 am | 11:56 pm → 12:15 am |
Leave Swami Vivekananda Road → arrive Nallurahalli. Changes allow at least 4 minutes. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.
Questions
- What is the metro fare from Swami Vivekananda Road to Nallurahalli?
- ₹50 by token or QR ticket. Smart card, peak hours: ₹47.50; Smart card, off-peak: ₹45.
- How long does the metro take from Swami Vivekananda Road to Nallurahalli?
- About 20 minutes for 9 stations (11.6 km), no change of line.
- When is the first and last metro from Swami Vivekananda Road to Nallurahalli?
- On Monday: first at 5:06 am, last that still reaches Nallurahalli at 11:56 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations83 stations, A to Z
- Green LineSilk Institute – Madavara
- Yellow LineRV Road – Bommasandra
- Purple LineWhitefield – Challaghatta
Data: Bengaluru network, timetable and fares: bmrcl-gtfs by Vonter, from BMRCL's published timetables and fares, with station positions © OpenStreetMap contributors. Available under the Open Database License (ODbL). Timetable valid 17 Aug 2026 to 17 Aug 2027. BMRCL publishes times only for the end stations; times at stations in between are worked out from distance and speed, so they can be off by a couple of minutes.