Home › Hyderabad › Ameerpet → Musheerabad
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
Ameerpet to Musheerabad metro: route, fare and timings
₹47, about 25 minutes, 8 stations, change at Parade Ground.
Ameerpet → Musheerabad
- Travel time
- 25 min
- Stations
- 8
- Changes
- 1
Your route
- AmeerpetBoard the Blue Line at Ameerpet, towards Nagole. Ride 5 stations (11 min).
- Parade GroundChange at Parade Ground to the Green Line, towards MG Bus Station. Ride 3 stations (6 min).allow about 8 min to change platforms
- MusheerabadArrive at Musheerabad
All 9 stations on the way
- Ameerpet
- Begumpet
- Prakash Nagar
- Rasoolpura
- Paradise
- Parade Ground
- Secunderabad West
- Gandhi Hospital
- Musheerabad
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:09 am → 6:35 am | 11:13 pm → 11:42 pm |
| Saturday | 6:08 am → 6:35 am | 11:20 pm → 11:48 pm |
| Sunday | 6:08 am → 6:35 am | 11:11 pm → 11:42 pm |
Leave Ameerpet → arrive Musheerabad. Changes allow at least 8 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from Ameerpet to Musheerabad?
- ₹47 by token, QR ticket or smart card.
- How long does the metro take from Ameerpet to Musheerabad?
- About 25 minutes for 8 stations (9.8 km), change at Parade Ground.
- When is the first and last metro from Ameerpet to Musheerabad?
- On Monday to Friday: first at 6:09 am, last that still reaches Musheerabad at 11:13 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.