Home › Hyderabad › Begumpet → Raidurg
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
Begumpet to Raidurg metro: route, fare and timings
₹47, about 23 minutes, 10 stations, no change of line.
Begumpet → Raidurg
- Travel time
- 23 min
- Stations
- 10
- Changes
- Direct
Your route
- BegumpetBoard the Blue Line at Begumpet, towards Raidurg. Ride 10 stations (23 min).
- RaidurgArrive at Raidurg
All 11 stations on the way
- Begumpet
- Ameerpet
- Madhura Nagar
- Yusufguda
- Road No 5 Jubilee Hills
- Jubilee Hills Checkpost
- Peddamma Gudi
- Madhapur
- Durgam Cheruvu
- HITEC City
- Raidurg
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:04 am → 6:29 am | 11:25 pm → 11:48 pm |
| Saturday | 6:04 am → 6:29 am | 11:24 pm → 11:47 pm |
| Sunday | 6:04 am → 6:29 am | 11:24 pm → 11:47 pm |
Leave Begumpet → arrive Raidurg. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from Begumpet to Raidurg?
- ₹47 by token, QR ticket or smart card.
- How long does the metro take from Begumpet to Raidurg?
- About 23 minutes for 10 stations (11.6 km), no change of line.
- When is the first and last metro from Begumpet to Raidurg?
- On Monday to Friday: first at 6:04 am, last that still reaches Raidurg at 11:25 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.