Home › Hyderabad › Erragadda → Madhura Nagar
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
Erragadda to Madhura Nagar metro: route, fare and timings
₹17, about 11 minutes, 4 stations, change at Ameerpet.
Erragadda → Madhura Nagar
- Travel time
- 11 min
- Stations
- 4
- Changes
- 1
Your route
- ErragaddaBoard the Red Line at Erragadda, towards LB Nagar. Ride 3 stations (5 min).
- AmeerpetChange at Ameerpet to the Blue Line, towards Raidurg. Ride 1 station (1 min).allow about 4 min to change platforms
- Madhura NagarArrive at Madhura Nagar
All 5 stations on the way
- Erragadda
- ESI Hospital
- SR Nagar
- Ameerpet
- Madhura Nagar
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:03 am → 6:20 am | 11:13 pm → 11:30 pm |
| Saturday | 6:03 am → 6:19 am | 11:13 pm → 11:29 pm |
| Sunday | 6:05 am → 6:19 am | 11:13 pm → 11:29 pm |
Leave Erragadda → arrive Madhura Nagar. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from Erragadda to Madhura Nagar?
- ₹17 by token, QR ticket or smart card.
- How long does the metro take from Erragadda to Madhura Nagar?
- About 11 minutes for 4 stations (3.4 km), change at Ameerpet.
- When is the first and last metro from Erragadda to Madhura Nagar?
- On Monday to Friday: first at 6:03 am, last that still reaches Madhura Nagar at 11:13 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.