MetroRouteMetroRoute
हिं

Home › Hyderabad › HITEC City → Lakdi-ka-pul

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

HITEC City to Lakdi-ka-pul metro: route, fare and timings

₹51, about 29 minutes, 12 stations, change at Ameerpet.

HITEC City → Lakdi-ka-pul

Fare · Token, QR or smart card₹51
Travel time
29 min
Stations
12
Changes
1

Your route

  1. HITEC CityBoard the Blue Line at HITEC City, towards Nagole. Ride 8 stations (17 min).
  2. AmeerpetChange at Ameerpet to the Red Line, towards LB Nagar. Ride 4 stations (8 min).allow about 4 min to change platforms
  3. Lakdi-ka-pulArrive at Lakdi-ka-pul
All 13 stations on the way
  1. HITEC City
  2. Durgam Cheruvu
  3. Madhapur
  4. Peddamma Gudi
  5. Jubilee Hills Checkpost
  6. Road No 5 Jubilee Hills
  7. Yusufguda
  8. Madhura Nagar
  9. Ameerpet
  10. Punjagutta
  11. Irrum Manzil
  12. Khairatabad
  13. Lakdi-ka-pul

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:03 am → 6:36 am10:56 pm → 11:26 pm
Saturday6:03 am → 6:36 am10:52 pm → 11:26 pm
Sunday6:03 am → 6:38 am10:55 pm → 11:26 pm

Leave HITEC City → arrive Lakdi-ka-pul. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from HITEC City to Lakdi-ka-pul?
₹51 by token, QR ticket or smart card.
How long does the metro take from HITEC City to Lakdi-ka-pul?
About 29 minutes for 12 stations (12.7 km), change at Ameerpet.
When is the first and last metro from HITEC City to Lakdi-ka-pul?
On Monday to Friday: first at 6:03 am, last that still reaches Lakdi-ka-pul at 10:56 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.