Home › Hyderabad › Jubilee Hills Checkpost → Peddamma Gudi
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
Jubilee Hills Checkpost to Peddamma Gudi metro: route, fare and timings
₹11, about 1 minutes, 1 stations, no change of line.
Jubilee Hills Checkpost → Peddamma Gudi
- Travel time
- 1 min
- Stations
- 1
- Changes
- Direct
Your route
- Jubilee Hills CheckpostBoard the Blue Line at Jubilee Hills Checkpost, towards Raidurg. Ride 1 station (1 min).
- Peddamma GudiArrive at Peddamma Gudi
All 2 stations on the way
- Jubilee Hills Checkpost
- Peddamma Gudi
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:06 am → 6:08 am | 11:37 pm → 11:38 pm |
| Saturday | 6:06 am → 6:07 am | 11:36 pm → 11:38 pm |
| Sunday | 6:06 am → 6:07 am | 11:37 pm → 11:38 pm |
Leave Jubilee Hills Checkpost → arrive Peddamma Gudi. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from Jubilee Hills Checkpost to Peddamma Gudi?
- ₹11 by token, QR ticket or smart card.
- How long does the metro take from Jubilee Hills Checkpost to Peddamma Gudi?
- About 1 minutes for 1 stations (0.7 km), no change of line.
- When is the first and last metro from Jubilee Hills Checkpost to Peddamma Gudi?
- On Monday to Friday: first at 6:06 am, last that still reaches Peddamma Gudi at 11:37 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.