Home › Hyderabad › Madhapur → Stadium
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
Madhapur to Stadium metro: route, fare and timings
₹61, about 37 minutes, 17 stations, no change of line.
Madhapur → Stadium
- Travel time
- 37 min
- Stations
- 17
- Changes
- Direct
Your route
- MadhapurBoard the Blue Line at Madhapur, towards Nagole. Ride 17 stations (37 min).
- StadiumArrive at Stadium
All 18 stations on the way
- Madhapur
- Peddamma Gudi
- Jubilee Hills Checkpost
- Road No 5 Jubilee Hills
- Yusufguda
- Madhura Nagar
- Ameerpet
- Begumpet
- Prakash Nagar
- Rasoolpura
- Paradise
- Parade Ground
- Secunderabad East
- Mettuguda
- Tarnaka
- Habsiguda
- NGRI
- Stadium
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:07 am → 6:44 am | 11:08 pm → 11:45 pm |
| Saturday | 6:07 am → 6:44 am | 11:07 pm → 11:44 pm |
| Sunday | 6:07 am → 6:44 am | 11:07 pm → 11:44 pm |
Leave Madhapur → arrive Stadium. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from Madhapur to Stadium?
- ₹61 by token, QR ticket or smart card.
- How long does the metro take from Madhapur to Stadium?
- About 37 minutes for 17 stations (20.7 km), no change of line.
- When is the first and last metro from Madhapur to Stadium?
- On Monday to Friday: first at 6:07 am, last that still reaches Stadium at 11:08 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.