MetroRouteMetroRoute
हिं

Home › Hyderabad › Madhura Nagar → Nampally

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

Madhura Nagar to Nampally metro: route, fare and timings

₹37, about 17 minutes, 7 stations, change at Ameerpet.

Madhura Nagar → Nampally

Fare · Token, QR or smart card₹37
Travel time
17 min
Stations
7
Changes
1

Your route

  1. Madhura NagarBoard the Blue Line at Madhura Nagar, towards Nagole. Ride 1 station (1 min).
  2. AmeerpetChange at Ameerpet to the Red Line, towards LB Nagar. Ride 6 stations (11 min).allow about 4 min to change platforms
  3. NampallyArrive at Nampally
All 8 stations on the way
  1. Madhura Nagar
  2. Ameerpet
  3. Punjagutta
  4. Irrum Manzil
  5. Khairatabad
  6. Lakdi-ka-pul
  7. Assembly
  8. Nampally

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:07 am → 6:30 am11:11 pm → 11:29 pm
Saturday6:06 am → 6:30 am11:07 pm → 11:29 pm
Sunday6:06 am → 6:30 am11:09 pm → 11:29 pm

Leave Madhura Nagar → arrive Nampally. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from Madhura Nagar to Nampally?
₹37 by token, QR ticket or smart card.
How long does the metro take from Madhura Nagar to Nampally?
About 17 minutes for 7 stations (6.6 km), change at Ameerpet.
When is the first and last metro from Madhura Nagar to Nampally?
On Monday to Friday: first at 6:07 am, last that still reaches Nampally at 11:11 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.