MetroRouteMetroRoute
हिं

Home › Hyderabad › Miyapur → Nagole

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

Miyapur to Nagole metro: route, fare and timings

₹69, about 51 minutes, 23 stations, change at Ameerpet.

Miyapur → Nagole

Fare · Token, QR or smart card₹69
Travel time
51 min
Stations
23
Changes
1

Your route

  1. MiyapurBoard the Red Line at Miyapur, towards LB Nagar. Ride 10 stations (18 min).
  2. AmeerpetChange at Ameerpet to the Blue Line, towards Nagole. Ride 13 stations (28 min).allow about 4 min to change platforms
  3. NagoleArrive at Nagole
All 24 stations on the way
  1. Miyapur
  2. JNTU College
  3. KPHB Colony
  4. Kukatpally
  5. Balanagar
  6. Moosapet
  7. Bharat Nagar
  8. Erragadda
  9. ESI Hospital
  10. SR Nagar
  11. Ameerpet
  12. Begumpet
  13. Prakash Nagar
  14. Rasoolpura
  15. Paradise
  16. Parade Ground
  17. Secunderabad East
  18. Mettuguda
  19. Tarnaka
  20. Habsiguda
  21. NGRI
  22. Stadium
  23. Uppal
  24. Nagole

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:00 am → 6:57 am10:48 pm → 11:40 pm
Saturday6:00 am → 6:57 am10:50 pm → 11:48 pm
Sunday6:00 am → 6:57 am10:47 pm → 11:39 pm

Leave Miyapur → arrive Nagole. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from Miyapur to Nagole?
₹69 by token, QR ticket or smart card.
How long does the metro take from Miyapur to Nagole?
About 51 minutes for 23 stations (28.2 km), change at Ameerpet.
When is the first and last metro from Miyapur to Nagole?
On Monday to Friday: first at 6:00 am, last that still reaches Nagole at 10:48 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.