Home › Hyderabad › NGRI → HITEC City
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
NGRI to HITEC City metro: route, fare and timings
₹65, about 40 minutes, 18 stations, no change of line.
NGRI → HITEC City
- Travel time
- 40 min
- Stations
- 18
- Changes
- Direct
Your route
- NGRIBoard the Blue Line at NGRI, towards Raidurg. Ride 18 stations (40 min).
- HITEC CityArrive at HITEC City
All 19 stations on the way
- NGRI
- Habsiguda
- Tarnaka
- Mettuguda
- Secunderabad East
- Parade Ground
- Paradise
- Rasoolpura
- Prakash Nagar
- Begumpet
- Ameerpet
- Madhura Nagar
- Yusufguda
- Road No 5 Jubilee Hills
- Jubilee Hills Checkpost
- Peddamma Gudi
- Madhapur
- Durgam Cheruvu
- HITEC City
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:05 am → 6:45 am | 11:05 pm → 11:45 pm |
| Saturday | 6:05 am → 6:45 am | 11:05 pm → 11:44 pm |
| Sunday | 6:05 am → 6:45 am | 11:05 pm → 11:45 pm |
Leave NGRI → arrive HITEC City. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from NGRI to HITEC City?
- ₹65 by token, QR ticket or smart card.
- How long does the metro take from NGRI to HITEC City?
- About 40 minutes for 18 stations (22 km), no change of line.
- When is the first and last metro from NGRI to HITEC City?
- On Monday to Friday: first at 6:05 am, last that still reaches HITEC City at 11:05 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.