MetroRouteMetroRoute
हिं

Home › Hyderabad › Stadium → Kukatpally

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

Stadium to Kukatpally metro: route, fare and timings

₹65, about 40 minutes, 18 stations, change at Ameerpet.

Stadium → Kukatpally

Fare · Token, QR or smart card₹65
Travel time
40 min
Stations
18
Changes
1

Your route

  1. StadiumBoard the Blue Line at Stadium, towards Raidurg. Ride 11 stations (24 min).
  2. AmeerpetChange at Ameerpet to the Red Line, towards Miyapur. Ride 7 stations (12 min).allow about 4 min to change platforms
  3. KukatpallyArrive at Kukatpally
All 19 stations on the way
  1. Stadium
  2. NGRI
  3. Habsiguda
  4. Tarnaka
  5. Mettuguda
  6. Secunderabad East
  7. Parade Ground
  8. Paradise
  9. Rasoolpura
  10. Prakash Nagar
  11. Begumpet
  12. Ameerpet
  13. SR Nagar
  14. ESI Hospital
  15. Erragadda
  16. Bharat Nagar
  17. Moosapet
  18. Balanagar
  19. Kukatpally

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:04 am → 6:51 am10:53 pm → 11:40 pm
Saturday6:04 am → 6:52 am10:53 pm → 11:32 pm
Sunday6:04 am → 6:53 am10:57 pm → 11:40 pm

Leave Stadium → arrive Kukatpally. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from Stadium to Kukatpally?
₹65 by token, QR ticket or smart card.
How long does the metro take from Stadium to Kukatpally?
About 40 minutes for 18 stations (21.3 km), change at Ameerpet.
When is the first and last metro from Stadium to Kukatpally?
On Monday to Friday: first at 6:04 am, last that still reaches Kukatpally at 10:53 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.