MetroRouteMetroRoute
हिं

Home › Hyderabad › Kukatpally → Sultan Bazar

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

Kukatpally to Sultan Bazar metro: route, fare and timings

₹56, about 34 minutes, 17 stations, change at MG Bus Station.

Kukatpally → Sultan Bazar

Fare · Token, QR or smart card₹56
Travel time
34 min
Stations
17
Changes
1

Your route

  1. KukatpallyBoard the Red Line at Kukatpally, towards LB Nagar. Ride 16 stations (28 min).
  2. MG Bus StationChange at MG Bus Station to the Green Line, towards Parade Ground. Ride 1 station (1 min).allow about 4 min to change platforms
  3. Sultan BazarArrive at Sultan Bazar
All 18 stations on the way
  1. Kukatpally
  2. Balanagar
  3. Moosapet
  4. Bharat Nagar
  5. Erragadda
  6. ESI Hospital
  7. SR Nagar
  8. Ameerpet
  9. Punjagutta
  10. Irrum Manzil
  11. Khairatabad
  12. Lakdi-ka-pul
  13. Assembly
  14. Nampally
  15. Gandhi Bhavan
  16. Osmania Medical College
  17. MG Bus Station
  18. Sultan Bazar

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:06 am → 6:50 am10:54 pm → 11:36 pm
Saturday6:06 am → 6:50 am11:06 pm → 11:42 pm
Sunday6:06 am → 6:50 am10:54 pm → 11:36 pm

Leave Kukatpally → arrive Sultan Bazar. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from Kukatpally to Sultan Bazar?
₹56 by token, QR ticket or smart card.
How long does the metro take from Kukatpally to Sultan Bazar?
About 34 minutes for 17 stations (15.8 km), change at MG Bus Station.
When is the first and last metro from Kukatpally to Sultan Bazar?
On Monday to Friday: first at 6:06 am, last that still reaches Sultan Bazar at 10:54 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.