MetroRouteMetroRoute
हिं

Home › Hyderabad › Sultan Bazar → Kukatpally

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

Sultan Bazar to Kukatpally metro: route, fare and timings

₹56, about 34 minutes, 17 stations, change at MG Bus Station.

Sultan Bazar → Kukatpally

Fare · Token, QR or smart card₹56
Travel time
34 min
Stations
17
Changes
1

Your route

  1. Sultan BazarBoard the Green Line at Sultan Bazar, towards MG Bus Station. Ride 1 station (1 min).
  2. MG Bus StationChange at MG Bus Station to the Red Line, towards Miyapur. Ride 16 stations (28 min).allow about 4 min to change platforms
  3. KukatpallyArrive at Kukatpally
All 18 stations on the way
  1. Sultan Bazar
  2. MG Bus Station
  3. Osmania Medical College
  4. Gandhi Bhavan
  5. Nampally
  6. Assembly
  7. Lakdi-ka-pul
  8. Khairatabad
  9. Irrum Manzil
  10. Punjagutta
  11. Ameerpet
  12. SR Nagar
  13. ESI Hospital
  14. Erragadda
  15. Bharat Nagar
  16. Moosapet
  17. Balanagar
  18. Kukatpally

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:04 am → 6:41 am11:06 pm → 11:40 pm
Saturday6:06 am → 6:41 am11:06 pm → 11:40 pm
Sunday6:06 am → 6:41 am11:06 pm → 11:40 pm

Leave Sultan Bazar → arrive Kukatpally. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from Sultan Bazar to Kukatpally?
₹56 by token, QR ticket or smart card.
How long does the metro take from Sultan Bazar to Kukatpally?
About 34 minutes for 17 stations (15.8 km), change at MG Bus Station.
When is the first and last metro from Sultan Bazar to Kukatpally?
On Monday to Friday: first at 6:04 am, last that still reaches Kukatpally at 11:06 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.