Home › Hyderabad › Road No 5 Jubilee Hills → Begumpet
Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.
Road No 5 Jubilee Hills to Begumpet metro: route, fare and timings
₹28, about 9 minutes, 4 stations, no change of line.
Road No 5 Jubilee Hills → Begumpet
- Travel time
- 9 min
- Stations
- 4
- Changes
- Direct
Your route
- Road No 5 Jubilee HillsBoard the Blue Line at Road No 5 Jubilee Hills, towards Nagole. Ride 4 stations (9 min).
- BegumpetArrive at Begumpet
All 5 stations on the way
- Road No 5 Jubilee Hills
- Yusufguda
- Madhura Nagar
- Ameerpet
- Begumpet
Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart
First and last trains on this route
| First train | Last train that gets you there | |
|---|---|---|
| Monday to Friday | 6:02 am → 6:12 am | 11:14 pm → 11:23 pm |
| Saturday | 6:02 am → 6:11 am | 11:14 pm → 11:23 pm |
| Sunday | 6:02 am → 6:11 am | 11:14 pm → 11:23 pm |
Leave Road No 5 Jubilee Hills → arrive Begumpet. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.
Questions
- What is the metro fare from Road No 5 Jubilee Hills to Begumpet?
- ₹28 by token, QR ticket or smart card.
- How long does the metro take from Road No 5 Jubilee Hills to Begumpet?
- About 9 minutes for 4 stations (4.5 km), no change of line.
- When is the first and last metro from Road No 5 Jubilee Hills to Begumpet?
- On Monday to Friday: first at 6:02 am, last that still reaches Begumpet at 11:14 pm.
You might also need
- Fare calculatorFare, route and next train
- Fare chartToken, QR and smart card
- First and last trainsEvery station, each way
- Metro mapAll lines and interchanges
- All stations56 stations, A to Z
- Red LineMiyapur – LB Nagar
- Green LineMG Bus Station – Parade Ground
- Blue LineRaidurg – Nagole
Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.