MetroRouteMetroRoute
हिं

Home › Hyderabad › Road No 5 Jubilee Hills → Nagole

Unofficial site. Not run by or linked to BMRCL, HMRL, KMRL, DMRC or any metro operator. Check fares and times at the station.

Road No 5 Jubilee Hills to Nagole metro: route, fare and timings

₹61, about 34 minutes, 16 stations, no change of line.

Road No 5 Jubilee Hills → Nagole

Fare · Token, QR or smart card₹61
Travel time
34 min
Stations
16
Changes
Direct

Your route

  1. Road No 5 Jubilee HillsBoard the Blue Line at Road No 5 Jubilee Hills, towards Nagole. Ride 16 stations (34 min).
  2. NagoleArrive at Nagole
All 17 stations on the way
  1. Road No 5 Jubilee Hills
  2. Yusufguda
  3. Madhura Nagar
  4. Ameerpet
  5. Begumpet
  6. Prakash Nagar
  7. Rasoolpura
  8. Paradise
  9. Parade Ground
  10. Secunderabad East
  11. Mettuguda
  12. Tarnaka
  13. Habsiguda
  14. NGRI
  15. Stadium
  16. Uppal
  17. Nagole

Share on WhatsApp

Fares go by distance: ₹11 to ₹69. Tokens, QR tickets and smart cards all cost the same. Fare chart

First and last trains on this route

First trainLast train that gets you there
Monday to Friday6:02 am → 6:37 am11:14 pm → 11:49 pm
Saturday6:02 am → 6:36 am11:14 pm → 11:48 pm
Sunday6:02 am → 6:36 am11:14 pm → 11:48 pm

Leave Road No 5 Jubilee Hills → arrive Nagole. Changes allow at least 4 minutes. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.

Questions

What is the metro fare from Road No 5 Jubilee Hills to Nagole?
₹61 by token, QR ticket or smart card.
How long does the metro take from Road No 5 Jubilee Hills to Nagole?
About 34 minutes for 16 stations (19.7 km), no change of line.
When is the first and last metro from Road No 5 Jubilee Hills to Nagole?
On Monday to Friday: first at 6:02 am, last that still reaches Nagole at 11:14 pm.

You might also need

Data: Hyderabad network, timetable and fares: HMRL's open GTFS data (published on Open Data Telangana, valid from 3 July 2026). Contains data provided by Hyderabad Metro Rail Ltd. Fares are shown after the discount in force since 24 May 2025. Timetable valid 3 Jul 2026 to 1 Jan 2030. Times come from HMRL's published timetable data; trains can run a minute or two early or late, and HMRL can change the timetable on special days.